Creek Overlook Boardwalk and Bridge 4 CLOSED Until Further NoticeNovember 2020
Due to the aging condition of the wooden boardwalk that runs along Coffee Creek (Creek Overlook), the Staff and CCWC Board Of Directors have CLOSED the wooden boardwalk and Bridge 4 until sustainable repairs can be made. Due to the magnitude of the project, the boardwalk and Bridge will remain CLOSED until further notice. Unauthorized entry into these closed areas is trespassing. UPDATE: December, 2020 Preliminary work has begun on addressing the infrastructural needs of the wooden boardwalks. As detailed information becomes available, check back on social media and our website for up-to-date information! **Would you like to contribute, financially, to the renovation of the Coffee Creek Watershed Preserve's boardwalks? Do you have specialized skills you would like to offer to the Non-Profit, Coffee Creek Watershed Conservancy? Fill out the form below to reach out to our team and Board of Directors! UPDATE: March 10, 2021 An outside engineering and design firm is working with the Board of Directors and CCWC Staff to assess overall trail issues, and specifically, the Creek Overlook Boardwalk failures. An overall design plan (to include wooden boardwalk replacements, bridge assessments, long-term trail repairs, and overall guest experience to The Preserve, among other priorities) is being created at this time. This design plan will allow the BOD and Staff to prioritize projects and target outside funding (donations and/or grant dollars) for these large scale, and expensive projects. |
|
Coffee Creek Watershed Preserve
(the place) Northeast corner of I-80/90 and IN 49 Chesterton Amphitheater 2401 Village Point, Chesterton, IN 46304 The Pavilion 178 E Sidewalk Rd, Chesterton, IN 46304 |
Coffee Creek Watershed Conservancy, Inc
(the non-profit organization) PO Box 802 Chesterton, IN 46304 219-926-1842 Email Us! |