Level Spreaders

 

ENVIRONMENTAL ENGINEERING

The restoration of the Coffee Creek corridor is being implemented with guidance of the world's top environmentalists to return pre-settlement systems to the landscape. In addition to the corridor, unique features in the built environment further the vertical infiltration of water. The Coffee Creek Center project is the first in the country to prove the concepts of civil engineering without traditional expensive and destructive storm water drainage systems, while providing a wide range of shared community open space.

 

GOOD / BEST

Play animation to see the
Level Spreader System
in action.


Or click here for a downloadable
brochure (PDF 944KB).

 

STORM WATER IS CONSIDERED A RESOURCE,
NOT A WASTE PRODUCT

 

 

LEVEL SPREADER WATER FILTRATION PROCESS

The storm water is taken into the underground pipe system.

The water level will rise as excess runoff is collected in the underground pipes.

When a pipe is full, the water will seep through the grate and flow over the ground.

   

LEVEL SPREADER INSTALLATION